- Bureau Hamid Kayrouz: Surface preparation of Ghazir Bridge (March 2016)
- Warde Steel and Metal: Surface Preparation of filter basket metal power plat (EDL) Zook Mosbeh (April 2016)
- ISPC s.a.r.l: Surface Preparation of filter basket metal Power plant ( EDL) Zook Mosbeh ( May 2016)
- Elictricite du Liban: Power plant Zook surface preparation of pipe heater for power plant unites (May 2016)
- A.R.Hourie: Surface Preparation of 6800 square meter concrete Dbayeh Water Front ( June 2016 )
- Regie Libanaise des Tabacs et Tombacs: Surface preparation of Vacuum Chamber ( July 2016)
- Betabat s.a.r.l: Surface preparation Metal Steel (August 2016)
- Itihad Baladiet El Chouf: Cleaning Black Traces of Industry of waste recycling (October 2016).
- American University of Beirut: Cleaning stone of Issam Fares Hold ( December 2016 )
- Kfoury Engineering & Contracting : Surface preparation concrete of 2500 square meter (October 2015)
- Scale Contracting :Cleaning stone 800 square meter Faqra club (June 2015)
- Elictricite du Liban: Power plant Zook surface preparation of pipe heater for power plant unites (June 2015)
- Injaz Tilal el Fanar :Surface preparation of 6500 square meter concrete (May 2015)
- Tiger Contracting Company:Surface preparation and paint removal LAU Jbeil (February 2015)
- Kilzi Co: Surface preparation (January 2015)
- Med Gulf: Cleaning stone of Head quarter Med Gulf Downton (June 2014)
- MEAS: Cleaning Entrance hall of the International Rafic Hariri Airport (May 2014)
- Aishti Mall : Surface preparation of 4000 square meter concrete ( March 2014)
- ABNIAH s.a.r.l :Surface preparation of 3500 square meter concrete Fal Tower Achrafieh (February 2013 )
- Mokbel International Group: Surface preparation of St Georges Residence 80000 Square meter (September 2012 till April 2013)
- Riviera Hotel: Surface preparation of Swimming pool (March 2013)
- Elictricite du Liban: Power plant Zook surface preparation of pipe heater for power plant unites (April 2013)
- A.R.Hourie:Surface Preparation of 3800 square meter concrete Achrafieh 4748 Project (June 2013)
- Project Engineering and construction:Cleaning the black traces Beirut, Roueis explosion location (August 2013)
- Dream Park: Surface preparation of the swimming pool (April 2012).
- MERG : Surface preparation of Swimming pool future mention Jnah (April 2012)
- Elictricite du Liban :Power plant Zook surface preparation of pipe heater for power plant unites (May 2012)
- NDU University : Surface Preparation of 1200 square meter concrete Loueyze (May 2012)
- Military Club:Surface preparation of 1290 square meter Yarze (June 2012)
- ABNIAH s.a.r.l :Surface preparation of steel Badaro Garden (June 2012)
- Charcutier Aoun :Cleaning and removing spots of heavy black smoke Jeita (June 2012)
- ABNIAH s.a.r.l :Surface preparation of 800 square meter concert Badaro Garden (September 2012 )
- Chadad Group: Surface Preparation of 4000 square meter concrete Clemenceau 303 building (September 2012).
- ACRES Le Mall :Cleaning and removing spots of heavy black smoke Dbayeh (October 2012 )
- Groupna s.a.r.l:Surface preparation of water tank ABC Achrafieh (November 2012)
- Solider Beirut Marina : Zaytouna Bay Surface preparation of 100 Pita (March 2012)
- Electricite du Liban : Zook power plant surface preparation of pipe heater for power plant unites (March 2012)
- MBC : Surface preparation 3 basements Mathaf center (March 2012)
- MMG : Cleaning Villa Chnaniir site (February 2012)
- Chadad Group : Surface Preparation of 6000 square meter concrete Clemenceau 303 building (November 2011)
- Yellow tech Petroleum Co : Surface preparation of Fuel tank 6500 square meter Tripoli (June 2011)
- Scale contracting : Cleaning stone 2 Villa Faqra Club (May 2011)
- Minat El Hoson 1371 : Surface Preparation of 3500 square meter concrete (February 2011)
- Integral : Surface Preparation of 2000 square meter concrete (January 2011)
- MERG : Surface Preparation of 5800 square meter concrete Future mention building Jnah (July 2010)
- Downtown Solider: Cleaning stone of MedGulf building (Juin 2010)
- Downtown Solider: Cleaning stone of Mont Blanc building (May 2010)
- Bureau Hamid Kairouz : Surface Preparation of 8000 square meter concrete Ghazir Bridge (April 2010)
- Middle East Air Port Services MES: Phase II Surface preparation of central cooling tower of the Air Port (March 2010)
- Minat El Hoson 1371 : Surface Preparation of 3800 square meter concrete (March 2010)
- Holcym Chekka : Sub contracting with Recovrit international PTY LTD cleaning 15 cubic meter of pebbles from oil spill (March 2010)
- Municipality of Jdeideh – Sid - BauchriehCleaning 25 statue at Hekmeh garden (October 2009)
- Dunkin Donuts building - Solidere: Cleaning stone (October 2009)
- Sada Liban and Axa building Hamra : Cleaning and Surface Preparation (September 2009)
- Atrium building : Cleaning the yellow stone of Atrium building including ( Roche bobois - Cadrans - and Karam Restaurant) Beirut Solidere (September 2009)
- Moussa Castel : Cleaning the Moussa Castel (September 2009)
- Middle East Agency Maritime s.a.r.l : Removing coating and surface preparation of ship FM SPIRIDON II (June 2009)
- Yanni Bakery : Cleaning and surface preparation of oven (June 2009)
- Tanmia chicken farm: Surface preparation of steel beams automated circuit for chicken steps (May 2009)
- BUMC - Boustany United Machineries Co.S.A.L: Lexus building Zalka main road cleaning and surface preparation of 5 basement (May 2009)
- Wakim Building : Cleaning stone (May 2009)
- Samaya Village: Removing paint and cleaning stone of six building (April 2009)
- Middle East Air Port Services MEAS: Surface preparation of central cooling tower of the Air port (April 2009)
- S.Mokbel & Partners: Garden View building Beirut surface preparation of concrete, (March 2009 Till August 2009)
- Charcutier Aoun : Cleaning and removing spots of heavy black smoke (January 2009)
- Al Moubarrat Al Khayria : Paint removing of Lebanese University (January 2009)
- Boulos Contracting : Cleaning Rotana building in solider down town (November 2008)
- Inchaat for Redy Mixed : Surface preparation of concrete mixer machine (August 2008)
- Middle East Agency Maritime s.a.r.l : Removing coating and surface preparation of ship FM SPIRIDON (May 2008)
- USAID -PROMAR : Phase 2 cleaning fuel oil from rocks after the Israeli attack on Jyieh power plant coastal line from Tabarja to Enfeh - Sites Names Tabarja - Bouar - Amchite 1- Amchite 2 -Heloueh - Baachta - Berbara 1 - Berbara 2 - Halat - (October 2007 till March 2008)
- Directorate of antiquities : Cleaning Qamou 'el Hermel, Hemel (September 2007)
- NGO Bahr Loubnan : Phase 1 cleaning fuel oil stains from rocks after the Israeli attack on Jyieh power plant sites name Jyieh Power plant - Civil Defense - Jonas Beach Resort - Nabeh Younes - Jyieh Marina Beach Resort - Pangea Beach Resort - Oras Beach Resort - William Kazan Costal line ( March 2007 till May 2007) covering several coastal centers.
- CORE : Mouawad Building in Down Town surface preparation of concrete (February 2007)
- Italian team Castallia Ecolmar : Cleaning under water fuel oil after Israeli attack on Jyieh power plant (October 2006)
- Entreprise Andre Hakimeh : Removing paints and coating on exiting stairways of the Jesuites building in Monot (August 2006)
- MMG : Cleaning external wall of the French Embassy (May 2006)
- Edde Sands : Cleaning entrance hall and the swimming pool (April 2006)
- Tabaris 812 building in Achrafieh after the damages caused by the attack on Danish Embassy in 2005: Removing spots of heavy black smoke from inside & outside the building (March 2006)
- Sohat Water mineral Truck : Removing paint and coating (January 2006)
- Tripoly Sahet el Tall : Cleaning the antiquity bldg of Sahit el tall (October 2005)