References
  • Bureau Hamid Kayrouz: Surface preparation of Ghazir Bridge (March 2016)
  • Warde Steel and Metal: Surface Preparation of filter basket metal power plat (EDL) Zook Mosbeh (April 2016)
  • ISPC s.a.r.l: Surface Preparation of filter basket metal Power plant ( EDL) Zook Mosbeh ( May 2016)
  • Elictricite du Liban: Power plant Zook surface preparation of pipe heater for power plant unites (May 2016)
  • A.R.Hourie: Surface Preparation of 6800 square meter concrete Dbayeh Water Front ( June 2016 )
  • Regie Libanaise des Tabacs et Tombacs: Surface preparation of Vacuum Chamber ( July 2016)
  • Betabat s.a.r.l: Surface preparation Metal Steel (August 2016)
  • Itihad Baladiet El Chouf: Cleaning Black Traces of Industry of waste recycling (October 2016).
  • American University of Beirut: Cleaning stone of Issam Fares Hold ( December 2016 )
  • Kfoury Engineering & Contracting : Surface preparation concrete of 2500 square meter (October 2015)
  • Scale Contracting :Cleaning stone 800 square meter Faqra club (June 2015)
  • Elictricite du Liban: Power plant Zook surface preparation of pipe heater for power plant unites (June 2015)
  • Injaz Tilal el Fanar :Surface preparation of 6500 square meter concrete (May 2015)
  • Tiger Contracting Company:Surface preparation and paint removal LAU Jbeil (February 2015)
  • Kilzi Co: Surface preparation (January 2015)
  • Med Gulf: Cleaning stone of Head quarter Med Gulf Downton (June 2014)
  • MEAS: Cleaning Entrance hall of the International Rafic Hariri Airport (May 2014)
  • Aishti Mall : Surface preparation of 4000 square meter concrete ( March 2014)
  • ABNIAH s.a.r.l :Surface preparation of 3500 square meter concrete Fal Tower Achrafieh (February 2013 )
  • Mokbel International Group: Surface preparation of St Georges Residence 80000 Square meter (September 2012 till April 2013)
  • Riviera Hotel: Surface preparation of Swimming pool (March 2013)
  • Elictricite du Liban: Power plant Zook surface preparation of pipe heater for power plant unites (April 2013)
  • A.R.Hourie:Surface Preparation of 3800 square meter concrete Achrafieh 4748 Project (June 2013)
  • Project Engineering and construction:Cleaning the black traces Beirut, Roueis explosion location (August 2013)
  • Dream Park:  Surface preparation of the swimming pool (April 2012).
  • MERG : Surface preparation of Swimming pool future mention Jnah (April 2012)
  • Elictricite du Liban :Power plant Zook surface preparation of pipe heater for power plant unites (May 2012)
  • NDU University : Surface Preparation of 1200 square meter concrete Loueyze (May 2012)
  • Military Club:Surface preparation of 1290 square meter Yarze (June 2012)
  • ABNIAH s.a.r.l :Surface preparation of steel Badaro Garden (June 2012)
  • Charcutier Aoun :Cleaning and removing spots of heavy black smoke Jeita (June 2012)
  • ABNIAH s.a.r.l :Surface preparation of 800 square meter concert Badaro Garden (September 2012 )
  • Chadad Group:  Surface Preparation of 4000 square meter concrete Clemenceau 303 building (September 2012).
  • ACRES Le Mall :Cleaning and removing spots of heavy black smoke Dbayeh (October 2012 )
  • Groupna s.a.r.l:Surface preparation of water tank ABC Achrafieh (November 2012)
  • Solider Beirut Marina : Zaytouna Bay Surface preparation of 100 Pita (March 2012)
  • Electricite du Liban : Zook power plant surface preparation of pipe heater for power plant unites (March 2012)
  • MBC : Surface preparation 3 basements Mathaf center (March 2012)
  • MMG : Cleaning Villa Chnaniir site (February 2012)
  • Chadad Group : Surface Preparation of 6000 square meter concrete Clemenceau 303 building (November 2011)
  • Yellow tech Petroleum Co : Surface preparation of Fuel tank 6500 square meter Tripoli (June 2011)
  • Scale contracting : Cleaning stone 2 Villa Faqra Club (May 2011)
  • Minat El Hoson 1371 : Surface Preparation of 3500 square meter concrete (February 2011)
  • Integral : Surface Preparation of 2000 square meter concrete (January 2011)
  • MERG : Surface Preparation of 5800 square meter concrete Future mention building Jnah (July 2010)
  • Downtown Solider: Cleaning stone of MedGulf building (Juin 2010)
  • Downtown Solider: Cleaning stone of Mont Blanc building (May 2010)
  • Bureau Hamid Kairouz : Surface Preparation of 8000 square meter concrete Ghazir Bridge (April 2010)
  • Middle East Air Port Services MES: Phase II Surface preparation of central cooling tower of the Air Port (March 2010)
  • Minat El Hoson 1371 : Surface Preparation of 3800 square meter concrete (March 2010)
  • Holcym Chekka : Sub contracting with Recovrit international PTY LTD cleaning 15 cubic meter of pebbles from oil spill (March 2010)
  • Municipality of Jdeideh – Sid - BauchriehCleaning 25 statue at Hekmeh garden (October 2009)
  • Dunkin Donuts building - Solidere: Cleaning stone (October 2009)
  • Sada Liban and Axa building Hamra : Cleaning and Surface Preparation (September 2009)
  • Atrium building : Cleaning the yellow stone of Atrium building including ( Roche bobois - Cadrans - and Karam Restaurant) Beirut Solidere (September 2009)
  • Moussa Castel : Cleaning the Moussa Castel (September 2009)
  • Middle East Agency Maritime s.a.r.l : Removing coating and surface preparation of ship FM SPIRIDON II (June 2009)
  • Yanni Bakery : Cleaning and surface preparation of oven (June 2009)
  • Tanmia chicken farm: Surface preparation of steel beams automated circuit for chicken steps (May 2009)
  • BUMC - Boustany United Machineries Co.S.A.L: Lexus building Zalka main road cleaning and surface preparation of 5 basement (May 2009)
  • Wakim Building : Cleaning stone (May 2009)
  • Samaya Village: Removing paint and cleaning stone of six building (April 2009)
  • Middle East Air Port Services MEAS: Surface preparation of central cooling tower of the Air port (April 2009)
  • S.Mokbel & Partners: Garden View building Beirut surface preparation of concrete, (March 2009 Till August 2009)
  • Charcutier Aoun : Cleaning and removing spots of heavy black smoke (January 2009)
  • Al Moubarrat Al Khayria : Paint removing of Lebanese University (January 2009)
  • Boulos Contracting : Cleaning Rotana building in solider down town (November 2008)
  • Inchaat for Redy Mixed : Surface preparation of concrete mixer machine (August 2008)
  • Middle East Agency Maritime s.a.r.l : Removing coating and surface preparation of ship FM SPIRIDON (May 2008)
  • USAID -PROMAR : Phase 2 cleaning fuel oil from rocks after the Israeli attack on Jyieh power plant coastal line from Tabarja to Enfeh - Sites Names Tabarja - Bouar - Amchite 1- Amchite 2 -Heloueh - Baachta - Berbara 1 - Berbara 2 - Halat - (October 2007 till March 2008)
  • Directorate of antiquities : Cleaning Qamou 'el Hermel, Hemel (September 2007)
  • NGO Bahr Loubnan : Phase 1 cleaning fuel oil stains from rocks after the Israeli attack on Jyieh power plant sites name Jyieh Power plant - Civil Defense - Jonas Beach Resort - Nabeh Younes - Jyieh Marina Beach Resort - Pangea Beach Resort - Oras Beach Resort - William Kazan Costal line ( March 2007 till May 2007) covering several coastal centers.
  • CORE : Mouawad Building in Down Town surface preparation of concrete (February 2007)
  • Italian team Castallia Ecolmar : Cleaning under water fuel oil after Israeli attack on Jyieh power plant (October 2006)
  • Entreprise Andre Hakimeh : Removing paints and coating on exiting stairways of the Jesuites building in Monot (August 2006)
  • MMG : Cleaning external wall of the French Embassy (May 2006)
  • Edde Sands : Cleaning entrance hall and the swimming pool (April 2006)
  • Tabaris 812 building in Achrafieh after the damages caused by the attack on Danish Embassy in 2005: Removing spots of heavy black smoke from inside & outside the building (March 2006)
  • Sohat Water mineral Truck : Removing paint and coating (January 2006)
  • Tripoly Sahet el Tall : Cleaning the antiquity bldg of Sahit el tall (October 2005)
 
Valid XHTML 1.0 Transitional Valid CSS!